Construction stakes are used to build formworks before pouring concrete, especially slab-on fill. Each stake has a round sloped tip so you can drive the stake into the ground with little effort. Each stake also has nail holes along the length where you can drive in nails to attach boards. You can also mark and paint stakes.
- 3/4" diameter stake
- 3/16” nail hole postioned every 1” along the length of the stake
- Chiseled point to drive through clay and compacted soil
- Made from cold rolled steel for heavy duty strength
These stakes are 42" long. They can be used in combination with our:
- Header form support brackets to which you nail 2"x4" boards
- Single screed hooks on which you place one 2"x4" board
- Double screed hooks on which you place two 2"x4" boards side by side
- Wire screed hooks
Pick package contents above: 10/pack, 50/pack, or 100/pack.
For more information
Need a large order?
Please reach out to us by phone or email for volume discounts and shipping.